SVY03A Data Center Campus

approved Campus

Operated by STACK Infrastructure

The SVY03A Data Center Campus in Hayward, developed by STACK Infrastructure on 11.3 acres, was reviewed by the California Energy Commission under a Mitigated Negative Declaration (SCH 2025030999) and includes an emergency backup generating facility of up to 67.2 MW.

Land use jurisdiction: City of Hayward

01

Measurements on record

Power

Backup generation capacity 67.2 MW (design) source

Size

Parcel size 11.3 acres (design) source
02

Approvals, by aspect

AspectApproving bodyInstrumentStatus
CEQA review California Energy Commission Mitigated Negative Declaration (SCH 2025030999)
document
on record
Land use entitlement (CUP / rezoning) not yet requested
Building permit not yet requested
Air permit (backup generators) not yet requested
Water supply (will-serve) not yet requested
Wastewater / septic not yet requested
Stormwater / retention ponds / dry wells not yet requested
Grid interconnection not yet requested
Natural gas supply not yet requested
Tax abatement / development agreement not yet requested
03

Location and sources

Hayward, Alameda County, California

Every record links to its source: openly licensed datasets (Epoch AI, CC BY; Wikidata, CC0; US EPA, public domain) and public permit records. Full sourcing and licensing: methodology · sources.