Sequoia Data Center

approved Campus

The Sequoia Data Center in Santa Clara received a California Energy Commission Small Power Plant Exemption (Docket 19-SPPE-03) for a backup generating facility of 54 diesel-fired generators with a capacity of 96.5 MW.

Land use jurisdiction: City of Santa Clara

01

Measurements on record

Power

Backup generators 54 units (design) source
Backup generation capacity 96.5 MW (design) source

Size

Building area 702,114 sq ft (design) source
02

Approvals, by aspect

AspectApproving bodyInstrumentStatus
CEQA review California Energy Commission Small Power Plant Exemption (Docket 19-SPPE-03) (2021-06-25)
document
on record
Land use entitlement (CUP / rezoning) not yet requested
Building permit not yet requested
Air permit (backup generators) not yet requested
Water supply (will-serve) not yet requested
Wastewater / septic not yet requested
Stormwater / retention ponds / dry wells not yet requested
Grid interconnection not yet requested
Natural gas supply not yet requested
Tax abatement / development agreement not yet requested
03

Location and sources

Santa Clara, Santa Clara County, California

Every record links to its source: openly licensed datasets (Epoch AI, CC BY; Wikidata, CC0; US EPA, public domain) and public permit records. Full sourcing and licensing: methodology · sources.