San Jose Data Center 04

proposed Campus

Operated by Microsoft Corporation

San Jose Data Center 04, a Microsoft project at Orchard Parkway and Component Drive, is under California Energy Commission review (Docket 22-SPPE-02) and would carry thirty-six emergency generators with a total maximum electrical demand of 97.8 MW.

Land use jurisdiction: City of San Jose

01

Measurements on record

Power

Total power capacity 97.8 MW (design) source
Backup generators 36 units (design) source
02

Approvals, by aspect

AspectApproving bodyInstrumentStatus
CEQA review California Energy Commission Small Power Plant Exemption application (Docket 22-SPPE-02)
document
pending
Land use entitlement (CUP / rezoning) not yet requested
Building permit not yet requested
Air permit (backup generators) not yet requested
Water supply (will-serve) not yet requested
Wastewater / septic not yet requested
Stormwater / retention ponds / dry wells not yet requested
Grid interconnection not yet requested
Natural gas supply not yet requested
Tax abatement / development agreement not yet requested
03

Location and sources

San Jose, Santa Clara County, California

Every record links to its source: openly licensed datasets (Epoch AI, CC BY; Wikidata, CC0; US EPA, public domain) and public permit records. Full sourcing and licensing: methodology · sources.