Mill Creek Corporate Center data center project, Salem
proposed CampusOperated by Verrus
Reported by press coverage: Salem data center project likely to proceed - Salem Reporter
Measurements on record
No disclosed measurements on record yet.
Permitting path
No approvals on record yet for any of the 12 path steps.
The generic United States sequence: local land-use approval with environmental review where a statute requires it, then utility service, construction permits, and operational air permits. States with an authored profile override this.
| Date | Step | Authority | Instrument | Status |
|---|---|---|---|---|
| Site control (deed or lease) | not yet requested | |||
| Environmental review applies where a federal action or a state review statute applies |
not yet requested | |||
| Land-use approval | not yet requested | |||
| Rezoning applies where the site's zoning does not already allow the use |
not yet requested | |||
| Natural gas service applies where the facility uses natural gas |
not yet requested | |||
| Utility interconnection | not yet requested | |||
| Wastewater service | not yet requested | |||
| Water service commitment | not yet requested | |||
| Building permit | not yet requested | |||
| Stormwater and grading applies where land disturbance passes permit thresholds |
not yet requested | |||
| Air permit for backup generators | not yet requested | |||
| Public agreements and incentives applies where negotiated with the host jurisdiction |
not yet requested | |||
| Go-live | not yet live |
Steps without a record are shown as not yet requested or not on record: absence of a record here is a records gap, not a finding about the facility. An authority shown for an empty step is the body that would issue it. Some authorities are shown before any record exists, from mapped utility service areas or, for sewer service, from municipal limits; these carry a marker naming the basis.
Site control comes first in every path: a proponent must hold a deed, lease, or purchase option on every parcel of the site before it can apply. Parcel and ownership records have not yet been pulled for this facility.
About this path and the law behind each step: the law on record for this jurisdiction
In the press
- Salem residents can comment on data center at July 27 Salem City Council meeting - Salem Reporter
- Salem Data Center: Verrus Shares New Project Details - Salem Business Journal
- Verrus eyes US$ 5.1 billion data center campus in Salem, Oregon - W.Media
- Salem data center project likely to proceed - Salem Reporter
- 75-acre data center proposed in Salem - KPTV
- Alphabet spin-out Verrus plans three-building data center campus outside Portland, Oregon - Data Center Dynamics
- Massive $5.1B data center proposed for Salem draws praise and pushback - KCBY
- Massive $5.1B data center proposed for Salem draws praise and pushback - KATU
- Salem Showdown Over $5.1 Billion Data Center Gamble - Hoodline
- UPDATED: Salem discloses proposed Mill Creek data center project after city released from NDA - Salem Reporter
- Data center pitched for southeast Salem's Mill Creek Corporate Center - Statesman Journal
Location and sources
Salem, Oregon