Data-center law in Tonga
National jurisdiction · as of 2026-09-05
Drafted with AI
Drafted with AI from the cited sources under the direction of UnGovr staff. UnGovr holds editorial responsibility for this page. How this site is made
Tonga has no data-centre-specific siting, permitting, environmental-review, energy-grid-interconnection, water-utility, construction, or air-emissions statute. A general incentive and restricted-business framework exists in the Foreign Investment Act 2020 (Act 7 of 2020), which does not name information technology or data infrastructure as a distinct priority sector, and its specific incentive terms are not described here.
Instruments on record
No data-center law on record for this jurisdiction yet. Absence of a record here is a coverage gap, not a finding that the jurisdiction has no law.
Every entry cites the instrument it describes. None of it is legal advice: verify a citation before relying on it. Full sourcing: read the methodology. The rest of the record: all jurisdictions.